My L&C Presentation


.

It was held on 22nd April 2013 at the A.V Room, infront of more than 60 audiences. Here is the powerpoint and the video of my presentation. I would like to apologize beforehand as my video have some difficulties or error.

My PowerPoint



My video..

Is English Language important for you?


.


Miss Ziana asked all of us this three questions:-

1. How many topics in L&C that you find  are useful for you in the future?

2. How can englich language can be important in your life?

3. What can you do to improve your current english language?

Extra information:

Brunei's english language is adapted to our culture, thus it can be difficult for us to study abroad (have to go through several process - english language examination) in which the english language level is harder than we expected. Thus, the students aiming for scholarship should be prepared for this and expand or widen your english knowledge..

Assignments After Phase Test 2


.

After the end of the Phase Test, don't forget about the submition of MIB report..

Report about 'Alat-alat Kebesaran DiRaja (Minimum - 6 equipment)

1.Kasur namat
2.Kalasak dan Kampilan
3. Changkah
4. Usungan DiRaja
5. Kaskul
6. Mahkota
7. Tongkat Ajai
8. Sinipit dan taming

The Assignment - 25%

Minimum - 2 page

Include the information or history of the place and write a short description of the equipments choosen by you.

Schedule of Phase Test 2 (Marine Department)


.

04/05/2013 (Saturday)       - Electrical Technology 1

06/05/2013 (Monday)        - General Engineering Knowledge 1

08/05/2013 (Wednesday)  - Naval Architecture 1

09/05/2013 (Thursday)      - Mechanical Science 1, Phase Test 3..

11/05/2013 (Saturday)       - Workshop Theory and Engineering Materials

13/05/2013 (Monday)        - Industrial Gs Turbine

14/05/2013 (Tuesday)*     - IT Practical Test

18/05/2013 (Saturday)       - Mathematics for Diploma 1

20/05/2013 (Monday)       - Pengetahuan Ugama Islam, End Test

Buzy with Assignments


.

 Are you still buzy with Assignments? The last submition of the portfolio and workshop report is on this Thursday, 2nd May 2013.




Use your time wisely and try to speed up your work as the Phase Test 2 is getting nearer. Give yourself times to study or recall the subjects and topics that we have leran.

Submition of three assignments.


.

One given assignment for Workshop Theory and Two assignments for Engineering Drawing. Time given was about 10 days and today is the last day of submition. Here are the pictures of my finished assignments (reports with drawings):-

Engineering Assignment 2 (Task 2) - Assembly Drawing

Engineering Drawing Assignment 3 (Task 2) - CAM Drawing

All of the reports (ED - Assembly and CAM drawing WT - Centre Lathe)

Ajaran Sesat


.

We were asked to explain the information that we extracted clearly and loudly. Overall, all 5 groups have done it very well, especiall for the last group (group E - include the Sultan's command @ 'Titah Sultan')